Sun Valley Master Plan
After nearly two years of planning, Mr. & Mrs. Earl Holding present their vision for Sun Valley’s future. This 50-Year Master Plan is as notable for what it does not do as what it does. It does not build out to its potential - in fact in almost every case, the plan reduces the maximum unit development by a third to one half. Through the foresight of Mr. and Mrs. Holding, this development program will allow Sun Valley Resort to maintain its world-class standing for decades.
Launch Master Plan Information Page
(IE 4.0 or higher & broadband connection recommended)
Bald Mountain Master Plan
As a logical extension of the 1989 Bald Mountain Master Plan, Sun Valley has released a ten year mountain master plan which includes ski area expansion, mountain access upgrades and expanded snowmaking installations. The plan will be implemented in three phases.
Bald Mountain - Phase 1 (gif image)
-
Construct Guyer Ridge ski trail
-
Re-align and grade Olympic Lane
-
Construct new Seattle Ridge ski trail
-
Approval of snowmaking on Frenchman’s terrain
-
Addition of snowmaking – Olympic Lane, Upper and Lower Broadway, Guyer Ridge, Upper Cozy, Upper Hemingway, Christmas Bowl and Brick’s Island.
-
Install River Run Gondola
-
Remove Exhibition
-
Remodel Roundhouse and expand operating period
-
Adjust permit area to include Guyer Ridge (62 acres) and currently skied Broadway Face (27 acres).
-
Terrain Park on lower Greyhawk
Bald Mountain - Phase 2 (gif image)
-
Install Seattle Ridge South (Turkey Bowl) Detachable Quad Chairlift
-
Construct Seattle Ridge South (Turkey Bowl) Novice/Low Intermediate Trails including Fire Road
-
Install Seattle Ridge South (Turkey Bowl) Snowmaking
-
Adjust permit area to include Seattle Ridge South (Turkey Bowl) Beginner Terrain (72 acres)
-
Replace Cold Springs with Detachable Quad Chairlift
-
Replace Mayday with Detachable Quad Chairlift
-
Remove Lookout Transport Lift
-
Upgrade and expand or replace Lookout Restaurant
Bald Mountain - Phase 3 (gif image)
-
Replace Christmas detachable quad chairlift with Gondola
-
Install detachable quadruple chairlift on Pod G
-
Install electrical power and communications to the top of the new lift in Pod G
-
Construct Pod G ski trails
-
Install snowmaking on Pod G
-
Replace Challenger with a Gondola
River Run Development & Annexation
White Clouds Residences