 |
|
|
|
|
|
 |
|
After nearly two years of planning, Mr. & Mrs. Earl Holding present their vision for Sun Valley’s future. This 50-Year Master Plan is as notable for what it does not do as what it does. It does not build out to its potential - in fact in almost every case, the plan reduces the maximum unit development by a third to one half. Through the foresight of Mr. and Mrs. Holding, this development program will allow Sun Valley Resort to maintain its world-class standing for decades.
|
|
|
Launch Master Plan Information Page
(IE 4.0 or higher & broadband connection recommended) |
| |
|
|
| As a logical extension of the 1989 Bald Mountain Master Plan, Sun Valley has released a ten year mountain master plan which includes ski area expansion, mountain access upgrades and expanded snowmaking installations. The plan will be implemented in three phases. |
|
Bald Mountain - Phase 1 (gif image)
- Construct Guyer Ridge ski trail
- Re-align and grade Olympic Lane
- Construct new Seattle Ridge ski trail
- Approval of snowmaking on Frenchman’s terrain
- Addition of snowmaking – Olympic Lane, Upper and Lower Broadway, Guyer Ridge, Upper Cozy, Upper Hemingway, Christmas Bowl and Brick’s Island.
- Install River Run Gondola
- Remove Exhibition
- Remodel Roundhouse and expand operating period
- Adjust permit area to include Guyer Ridge (62 acres) and currently skied Broadway Face (27 acres).
- Terrain Park on lower Greyhawk
Bald Mountain - Phase 2 (gif image)
- Install Seattle Ridge South (Turkey Bowl) Detachable Quad Chairlift
- Construct Seattle Ridge South (Turkey Bowl) Novice/Low Intermediate Trails including Fire Road
- Install Seattle Ridge South (Turkey Bowl) Snowmaking
- Adjust permit area to include Seattle Ridge South (Turkey Bowl) Beginner Terrain (72 acres)
- Replace Cold Springs with Detachable Quad Chairlift
- Replace Mayday with Detachable Quad Chairlift
- Remove Lookout Transport Lift
- Upgrade and expand or replace Lookout Restaurant
Bald Mountain - Phase 3 (gif image)
- Replace Christmas detachable quad chairlift with Gondola
- Install detachable quadruple chairlift on Pod G
- Install electrical power and communications to the top of the new lift in Pod G
- Construct Pod G ski trails
- Install snowmaking on Pod G
- Replace Challenger with a Gondola
|
|
|
 |
 |
 |
|
|
|
Sun Valley now boasts a new Superpipe on Warm Springs.
|
|
|
|
|
|
|
|
 |
 |
|